Chupadero Water System Improvements Draft Report

The New Mexico Finance Authority awarded a Local Government Planning Fund grant to the Chupadero Water and Sewage Corporation (CWSC) for a Preliminary Engineering Report (PER) to analyze the water system and develop and prioritize needed system improvements. CWSC selected Martin / Martin, Inc. to develop the PER. The file at the link below represents the 90% Draft PER. CWSC will hold a membership meeting on April 9, 2018 at 7:00 PM at the Rio en Medio Community Center at 5 El Alto Road so that the Engineer can present the draft report and gather public input and comments before finalizing the document.

90% Draft Preliminary Engineering Report »